We produce a top level product that we are proud to stand behind.
1 year warranty on all work done.
Highlighted Projects
Starr Trail Solutions has had the honour of completing a wide variety of trails and backcountry construction projects. Check out our completed project list here and see if any of your favourite trails, are Starr trails.
-
Golden Trail development: Schacher (14 km of dual directional, connecting town to the top of Mt. 7) Berminator (blue flow) , Rotary Trail (multi use gravel tread trail connecting town), 7-Up, Rodeo Drive, Golden Municipal Campground refurbishment
Swansea Trail Development: South Park Destination Trail, Hula Girl, Gravy Train Refurbishment, Washed Up, Beyond Meat, Climbing Trail Refurbishment
Hidden Valley Trail Development:
Sorry (Climbing Trail), Mitt Nibbler (green flow), Mac Jacket (blue flow), Great White (black flow tech), Red Surge (black tech), Tragically Steep (black hand built), Ski Island (black tech), Hoser (black tech flow) Kerfuffle (connector) -
Adaptive Trail (Golden BC):
“Arm Pumper” Type 2 Adaptive Trail climb 1.1km, “The Kids are Back” Type 4 Adaptive trail decent 728m, “Lippy Punk” Type 4 Adaptive decent 718mPedley Ridge and Pinto (Summit Trail Makers Society):
Single track sustainable hiking trails and trail reclamation.Penticton and Area Cycling Association Trails:
“Flowcoaster” consisting of 3 parts: “Green Out” green flow 537m, “Jumps” 270m, “Flowcoaster” (blue flow) 890mJr. Johnston Adaptive Trail Loop: (Invermere BC): 3.2km
Canmore Nordic Centre:
Race Course Downhill trail 196m -
Golden Pumptrack:
asphalt finish, conceptual design and constructionPenticton Pumptrack:
asphalt finish, conceptual design and construction -
High Rockies Trail:
Phase “C” and “F”Point Backcountry Campground Refurbishment
Ha Ling Peak Trail refurbishment (alpine portion)
Yamnuska Trail refurbishment (alpine portion, scramble and climbers route)
Turbine Canyon Backcountry Campground Refurbishment
-
Sunpeaks and Area Cycling Association
Summit Trail Makers Society
PTBA is the world's only private sector group of professional trail contractors, designers, and consultants. PTBA represents more than 100 Member Companies who have been professionally vetted and adhere to a strict code of conduct. Since 1976, PTBA members have designed, built, and maintained thousands of miles of trail.
PTBA represents the leading edge in sustainable trail development; we believe in trail design, construction, management and advocacy that enhance resource protection, recreational opportunities, economic development, active citizens, and connected communities worldwide.
